Track improvements and maintenance are taking place from 23:15 on 12/03/10 to 02:00 on 15/03/10 between Nuneaton and Leicester.
Whilst work is taking place, buses will replace trains
between Coleshill Parkway and Leicester via Nuneaton
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :14/01/2010 11:12
Track improvements and maintenance are taking place from 05:50 on 13/03/10 to 02:00 on 15/03/10 between Exeter St Davids and Plymouth.
Whilst work is taking place, buses will replace trains
between Tiverton Parkway and Plymouth via Exeter St Davids
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :14/01/2010 11:14
Track improvements and maintenance are taking place from 23:45 on 13/03/10 to 02:00 on 15/03/10 between Banbury and Oxford.
Whilst work is taking place, buses will replace trains
between Banbury and Oxford
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :14/01/2010 11:13
Track improvements and maintenance are taking place from 07:40 on 14/03/10 to 05:15 on 15/03/10 between Leeds and York.
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :14/01/2010 11:15
Track improvements and maintenance are taking place from 23:30 on 14/03/10 to 11:00 on 14/03/10 between Derby and Chesterfield.
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :14/01/2010 11:16
Track improvements and maintenance are taking place from 23:15 on 19/03/10 to 02:00 on 22/03/10 between Nuneaton and Leicester.
Whilst work is taking place, buses will replace trains
between Coleshill Parkway and Leicester via Nuneaton
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :14/01/2010 11:17
Track improvements and maintenance are taking place from 21:40 on 20/03/10 to 13:20 on 21/03/10 between Exeter St Davids and Plymouth.
Whilst work is taking place, buses will replace trains
between Tiverton Parkway and Plymouth via Exeter St Davids
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :14/01/2010 11:20
Track improvements and maintenance are taking place from 23:30 on 20/03/10 to 05:30 on 22/03/10 between Derby and Chesterfield.
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :14/01/2010 11:33
Track improvements and maintenance are taking place from 23:45 on 20/03/10 to 02:00 on 22/03/10 between Banbury and Oxford.
Whilst work is taking place, buses will replace trains
between Banbury and Oxford
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :14/01/2010 11:18
Track improvements and maintenance are taking place from 23:15 on 26/03/10 to 01:00 on 29/03/10 between Nuneaton and Leicester.
Whilst work is taking place, buses will replace trains
between Coleshill Parkway and Leicester via Nuneaton
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :14/01/2010 11:33
Track improvements and maintenance are taking place from 23:00 on 27/03/10 to 12:00 on 28/03/10 between Derby and Chesterfield.
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :14/01/2010 11:38
Track improvements and maintenance are taking place from 23:05 on 27/03/10 to 12:00 on 28/03/10 between Exeter St Davids and Plymouth.
Whilst work is taking place, buses will replace trains
between Tiverton Parkway and Plymouth via Exeter St Davids
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :14/01/2010 11:38
Track improvements and maintenance are taking place from 23:15 on 27/03/10 to 04:10 on 29/03/10 between Birmingham New Street and Nuneaton.
Whilst work is taking place, buses will replace trains
between Water Orton and Coleshill Parkway
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :14/01/2010 11:38
Track improvements and maintenance are taking place from 23:45 on 27/03/10 to 02:00 on 29/03/10 between Banbury and Oxford.
Whilst work is taking place, buses will replace trains
between Banbury and Oxford
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :14/01/2010 11:38
Track improvements and maintenance are taking place from 01:25 on 02/04/10 to 02:00 on 06/04/10 between Winchester and Southampton Central.
Whilst work is taking place, buses will replace trains
between Winchester and Southampton Central via Southampton Airport Parkwy
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :14/01/2010 11:39
Track improvements and maintenance are taking place from 02:00 on 02/04/10 to 04:00 on 06/04/10 between Basingstoke and Southampton Airport Parkwy.
Whilst work is taking place, buses will replace trains
between Southampton Airport Parkwy and Reading via Basingstoke
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :17/01/2010 16:00
Track improvements and maintenance are taking place from 02:00 on 03/04/10 to 09:10 on 04/04/10 between Coventry and Birmingham International.
Whilst work is taking place, buses will replace trains
between Leamington Spa and Birmingham International via Coventry
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :17/01/2010 16:04
Track improvements and maintenance are taking place from 20:20 on 03/04/10 to 02:00 on 05/04/10 between Glasgow Central and Motherwell.
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :17/01/2010 16:04
Track improvements and maintenance are taking place from 23:00 on 03/04/10 to 03:45 on 05/04/10 between Birmingham New Street and Gloucester.
Whilst work is taking place, buses will replace trains
between Birmingham New Street and Gloucester via Cheltenham Spa
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :17/01/2010 15:58
Track improvements and maintenance are taking place from 02:00 on 04/04/10 to 04:00 on 05/04/10 between Stockport and Manchester Piccadilly.
Whilst work is taking place, buses will replace trains
between Stockport and Manchester Piccadilly
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :17/01/2010 16:04
Track improvements and maintenance are taking place from 02:00 on 04/04/10 to 11:35 on 04/04/10 between Stansted Airport and Cambridge.
Whilst work is taking place, buses will replace trains
between Stansted Airport and Cambridge
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :17/01/2010 16:05
Track improvements and maintenance are taking place from 02:00 on 10/04/10 to 04:00 on 12/04/10 between Southampton Airport Parkwy and Basingstoke.
Whilst work is taking place, buses will replace trains
between Southampton Airport Parkwy and Basingstoke via Winchester
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :17/01/2010 16:46
Track improvements and maintenance are taking place from 10:45 on 10/04/10 to 14:20 on 11/04/10 between Motherwell and Edinburgh.
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :17/01/2010 16:47
Track improvements and maintenance are taking place from 23:00 on 10/04/10 to 04:00 on 12/04/10 between Birmingham New Street and Gloucester.
Whilst work is taking place, buses will replace trains
between Birmingham New Street and Gloucester via Cheltenham Spa
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :17/01/2010 16:37
Track improvements and maintenance are taking place from 01:25 on 17/04/10 to 04:00 on 19/04/10 between Southampton Airport Parkwy and Basingstoke.
Whilst work is taking place, buses will replace trains
between Southampton Airport Parkwy and Basingstoke via Winchester
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :17/01/2010 17:35
Track improvements and maintenance are taking place from 10:45 on 17/04/10 to 14:20 on 18/04/10 between Motherwell and Edinburgh.
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :17/01/2010 17:37
Track improvements and maintenance are taking place from 23:00 on 18/04/10 to 03:45 on 19/04/10 between Birmingham New Street and Gloucester.
Whilst work is taking place, buses will replace trains
between Birmingham New Street and Gloucester via Cheltenham Spa
More detailed information can be found on the internet at www.crosscountrytrains.co.uk or www.nationalrail.co.uk, by calling National Rail Enquiries on 08457 48 49 50, or on Ceefax -BBC2- page 439.
Message Received :17/01/2010 17:34
Track improvements and maintenance are taking place from 02:00 on 24/04/10 to 04:00 on 26/04/10 between Basingstoke and Southampton Airport Parkwy.
Whilst work is taking place, buses will replace trains
between Southampton Airport Parkwy and Basingstoke via Winchester
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :04/02/2010 16:36
Track improvements and maintenance are taking place from 23:00 on 24/04/10 to 03:45 on 26/04/10 between Birmingham Moor Street and Gloucester.
Whilst work is taking place, buses will replace trains
between Birmingham New Street and Gloucester via Cheltenham Spa
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :03/02/2010 15:48
Track improvements and maintenance are taking place from 02:00 on 25/04/10 to 04:30 on 26/04/10 between Tyseley and Birmingham New Street.
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :04/02/2010 16:39
Track improvements and maintenance are taking place from 02:00 on 25/04/10 to 04:20 on 26/04/10 between Stansted Airport and Cambridge.
Whilst work is taking place, buses will replace trains
between Stansted Airport and Cambridge
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :04/02/2010 16:40
Track improvements and maintenance are taking place from 02:00 on 01/05/10 to 05:25 on 03/05/10 between Birmingham International and Coventry.
Whilst work is taking place, buses will replace trains
between Leamington Spa and Birmingham International via Coventry
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :08/02/2010 17:47
Track improvements and maintenance are taking place from 02:00 on 02/05/10 to 05:00 on 03/05/10 between Wakefield Westgate and Sheffield.
Whilst work is taking place, buses will replace trains
between Wakefield Kirkgate and Wakefield Westgate
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :08/02/2010 17:48
Track improvements and maintenance are taking place from 02:00 on 02/05/10 to 01:30 on 03/05/10 between Southampton Airport Parkwy and Winchester.
Whilst work is taking place, buses will replace trains
between Basingstoke and Southampton Airport Parkwy via Winchester
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :08/02/2010 17:49
Track improvements and maintenance are taking place from 02:00 on 02/05/10 to 04:30 on 03/05/10 between Glasgow Central and Motherwell.
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :08/02/2010 17:50
Track improvements and maintenance are taking place from 23:00 on 02/05/10 to 03:45 on 04/05/10 between Birmingham Moor Street and Gloucester.
Whilst work is taking place, buses will replace trains
between Birmingham New Street and Gloucester via Cheltenham Spa
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :08/02/2010 17:43
Track improvements and maintenance are taking place from 02:00 on 08/05/10 to 04:30 on 10/05/10 between Reading and Guildford.
Whilst work is taking place, buses will replace trains
between Reading and Guildford
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :08/02/2010 18:38
Track improvements and maintenance are taking place from 23:00 on 08/05/10 to 03:45 on 09/05/10 between Birmingham New Street and Gloucester.
Whilst work is taking place, buses will replace trains
between Birmingham New Street and Gloucester via Cheltenham Spa
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :08/02/2010 17:52
Track improvements and maintenance are taking place from 23:00 on 08/05/10 to 05:00 on 10/05/10 between Sheffield and Wakefield Westgate.
Whilst work is taking place, buses will replace trains
between Wakefield Kirkgate and Wakefield Westgate
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :08/02/2010 18:42
Track improvements and maintenance are taking place from 02:00 on 09/05/10 to 04:30 on 10/05/10 between Birmingham New Street and Tyseley.
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :08/02/2010 18:41
Track improvements and maintenance are taking place from 02:00 on 09/05/10 to 04:30 on 10/05/10 between Haymarket and Inverkeithing.
Whilst work is taking place, buses will replace trains
between Edinburgh and Dundee
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :08/02/2010 18:44
Track improvements and maintenance are taking place from 02:00 on 09/05/10 to 04:30 on 10/05/10 between Glasgow Central and Motherwell.
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :08/02/2010 18:45
Track improvements and maintenance are taking place from 02:00 on 10/05/10 to 05:00 on 15/05/10 between Derby and Nottingham.
Whilst work is taking place, buses will replace trains
between Derby and Nottingham
The 23:09 Birmingham to Nottingham Service ONLY will terminate at Derby each weekday night.
Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.
Message Received :08/02/2010 18:49
Track improvements and maintenance are taking place from 02:00 on 15/05/10 to 04:30 on 17/05/10 between Reading and Guildford.
Whilst work is taking place, buses will replace trains
between Reading and Guildford
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :08/02/2010 19:01
Track improvements and maintenance are taking place from 23:00 on 15/05/10 to 03:45 on 17/05/10 between Birmingham New Street and Gloucester.
Whilst work is taking place, buses will replace trains
between Birmingham New Street and Gloucester via Cheltenham Spa
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :08/02/2010 18:59
Track improvements and maintenance are taking place from 23:00 on 15/05/10 to 05:00 on 17/05/10 between Sheffield and Wakefield Westgate.
Whilst work is taking place, buses will replace trains
between Wakefield Kirkgate and Wakefield Westgate
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :08/02/2010 19:02
Track improvements and maintenance are taking place from 02:00 on 16/05/10 to 04:30 on 17/05/10 between Haymarket and Inverkeithing.
Whilst work is taking place, buses will replace trains
between Edinburgh and Dundee
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :08/02/2010 19:05
Track improvements and maintenance are taking place from 02:00 on 16/05/10 to 04:30 on 17/05/10 between Glasgow Central and Motherwell.
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :08/02/2010 19:18
Track improvements and maintenance are taking place from 02:00 on 16/05/10 to 11:30 on 16/05/10 between Oxford and Banbury.
Whilst work is taking place, buses will replace trains
between Oxford and Banbury
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :08/02/2010 19:25
Track improvements and maintenance are taking place from 02:00 on 16/05/10 to 09:05 on 16/05/10 between Bournemouth and Brockenhurst.
Whilst work is taking place, buses will replace trains
between Bournemouth and Southampton Central
The 09:40 Bournemouth - Manchester Piccadilly service will start from Southhampton central. As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :08/02/2010 19:27
Track improvements and maintenance are taking place from 02:00 on 22/05/10 to 04:45 on 24/05/10 between Oxford and Banbury.
Whilst work is taking place, buses will replace trains
between Oxford and Banbury
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :08/02/2010 19:35
Track improvements and maintenance are taking place from 02:00 on 22/05/10 to 04:30 on 24/05/10 between Edinburgh and Inverkeithing.
Whilst work is taking place, buses will replace trains
between Edinburgh and Dundee
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :08/02/2010 19:48
Track improvements and maintenance are taking place from 22:05 on 22/05/10 to 13:00 on 23/05/10 between Stafford and Stoke-On-Trent.
Whilst work is taking place, buses will replace trains
between Stafford and Macclesfield via Stoke-On-Trent
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :08/02/2010 19:34
Track improvements and maintenance are taking place from 23:20 on 22/05/10 to 04:30 on 24/05/10 between Cheltenham Spa and Bristol Parkway.
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :08/02/2010 19:34
Track improvements and maintenance are taking place from 02:00 on 23/05/10 to 16:00 on 23/05/10 between Derby and Nottingham.
Whilst work is taking place, buses will replace trains
between Derby and Nottingham
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :08/02/2010 19:43
Track improvements and maintenance are taking place from 22:05 on 29/05/10 to 05:15 on 31/05/10 between Stafford and Stoke-On-Trent.
Whilst work is taking place, buses will replace trains
between Stafford and Stoke-On-Trent
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :08/02/2010 19:45
Track improvements and maintenance are taking place from 02:00 on 30/05/10 to 16:15 on 30/05/10 between Guildford and Reading.
The 1214 Guildford to Newcastle service will start from Reading. As a result some trains may be altered causing extended journey times. Details of engineering works can be found on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on 08457 48 49 50.
Message Received :08/02/2010 19:50
Track improvements and maintenance are taking place from 23:25 on 30/05/10 to 04:30 on 01/06/10 between Cheltenham Spa and Bristol Parkway.
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :08/02/2010 19:46
Track improvements and maintenance are taking place from 02:00 on 24/04/40 to 05:25 on 26/04/10 between Sheffield and Wakefield Westgate.
Whilst work is taking place, buses will replace trains
between Wakefield Westgate and Wakefield Kirkgate
As a result some trains may be altered causing extended journey times. Details of engineering works can be found
on Ceefax Pages on BBC2 and further Information is available from the National Rail Telephone Enquiry Bureau on
08457 48 49 50.
Message Received :04/02/2010 16:38
ARCHWAY STATION: Closed after 2200 each day from Sunday to Thursday, inclusive, until Thursday 27 May. However, the station is closed all day on Saturday 13 and Sunday 14 March.
This will affect journeys
from 10/03/2010 22:00
to 10/03/2010 23:59
,
from 11/03/2010 00:00
to 11/03/2010 01:29
.
Message Received : 21/10/2009 08:19
BLACKFRIARS UNDERGROUND STATION: Closed until late 2011. District and Circle line trains do not serve the station. Please bear this in mind if purchasing a season ticket or registering your Oystercards.
This will affect journeys
from 16/03/2009 01:30
to 01/11/2011 01:30
.
Message Received : 21/09/2009 04:27
CLAPHAM SOUTH STATION: Closed after 2200 each evening Sunday to Thursday, until Thursday 22 April.
This will affect journeys
from 11/03/2010 00:00
to 11/03/2010 01:29
,
from 10/03/2010 22:00
to 10/03/2010 23:59
.
Message Received : 31/08/2009 10:15
SOUTH WIMBLEDON STATION: Closed after 2200 each day from Sunday to Thursday, inclusive, from Monday 4 January until Thursday 27 May, inclusive.
This will affect journeys
from 10/03/2010 22:00
to 10/03/2010 23:59
,
from 11/03/2010 00:00
to 11/03/2010 01:29
.
Message Received : 03/11/2009 13:12
BANK STATION: During escalator replacement work there is no step-free access to the Docklands Light Railway (DLR) and a reduced escalator service between the DLR and Northern/Central/Waterloo & City lines at Bank. A one-way system, via the staircase from the Northern line platforms, will operate for customers accessing the DLR from Bank station. Allow extra time to change between the DLR and Bank station in either direction.
This will affect journeys
from 01/03/2010 04:00
to 31/12/2010 01:29
.
Message Received : 05/03/2010 00:18
BOND STREET STATION: Reduced escalator service until late March 2010.
This will affect journeys
from 25/02/2010 07:55
to 30/03/2010 02:29
.
Message Received : 08/03/2010 03:11
CANARY WHARF STATION: Reduced escalator service until mid May 2010.
This will affect journeys
from 15/01/2010 13:20
to 16/05/2010 02:29
.
Message Received : 15/01/2010 13:20
GOING TO COVENT GARDEN? Covent Garden station gets very busy at weekends and in the evenings, but you can avoid the crowds by walking there from Leicester Square (6 minutes) or Holborn (9 minutes). The short walk is clearly signposted above ground and maps are on display at both stations.
This will affect journeys
from 09/02/2010 14:15
to 10/02/2012 01:29
.
Message Received : 21/02/2010 21:45
EDGWARE ROAD STATION: Reduced lift service until late July 2010.
This will affect journeys
from 25/02/2010 07:55
to 30/07/2010 02:29
.
Message Received : 08/03/2010 03:08
GOLDERS GREEN STATION: No step-free access available to the southbound platform due to a faulty lift.
This will affect journeys
from 10/03/2010 07:23
to 11/03/2010 01:29
.
Message Received : 10/03/2010 07:23
GREENFORD STATION: Due to works taking place, the car park will be closed until the end of 2010.
This will affect journeys
from 17/06/2009 13:41
to 01/01/2011 01:29
.
Message Received : 17/06/2009 18:01
HEATHROW TERMINALS 123 STATION: Reduced escalator service until mid June 2010.
This will affect journeys
from 25/02/2010 07:55
to 15/06/2010 02:29
.
Message Received : 08/03/2010 03:06
HOLLAND PARK STATION: Reduced lift service until mid June 2010.
This will affect journeys
from 25/02/2010 07:55
to 15/06/2010 02:29
.
Message Received : 08/03/2010 23:10
KILBURN STATION: No step-free access due to a faulty lift.
This will affect journeys
from 10/03/2010 11:11
to 11/03/2010 01:29
.
Message Received : 10/03/2010 11:11
LAMBETH NORTH STATION: Reduced lift service until late June 2010.
This will affect journeys
from 15/01/2010 13:20
to 30/06/2010 02:29
.
Message Received : 08/03/2010 03:03
LEICESTER SQUARE STATION: Reduced escalator service until mid May 2010.
This will affect journeys
from 23/01/2009 01:30
to 16/05/2010 02:29
.
Message Received : 23/01/2010 05:43
LONDON BRIDGE STATION: Reduced escalator service until further notice.
This will affect journeys
from 17/09/2009 11:52
to 17/05/2010 02:29
.
Message Received : 17/09/2009 11:52
NOTTING HILL GATE STATION: Reduced escalator service until late June.
This will affect journeys
from 17/09/2009 11:52
to 30/06/2010 02:29
.
Message Received : 08/03/2010 02:54
OXFORD CIRCUS: Until further notice, due to escalator work Central line passengers travelling to Oxford Street are strongly advised to avoid exiting at Oxford Circus station. Use Bond Street or Tottenham Court Road stations instead. Access to the Central line and interchange with the Bakerloo and Victoria lines is not affected.
This will affect journeys
from 13/09/2009 05:00
to 01/07/2010 02:29
.
Message Received : 23/01/2010 05:48
PICCADILLY CIRCUS STATION: Reduced escalator service until further notice.
This will affect journeys
from 15/01/2010 13:20
to 16/05/2010 02:29
.
Message Received : 15/01/2010 13:23
QUEENSWAY STATION: Reduced lift service until early August 2010.
This will affect journeys
from 15/01/2010 13:20
to 15/08/2010 02:29
.
Message Received : 08/03/2010 03:00
SOUTH KENSINGTON STATION: Reduced escalator service until late March 2010.
This will affect journeys
from 15/01/2010 13:20
to 25/03/2010 01:29
.
Message Received : 15/01/2010 13:25
SWISS COTTAGE STATION: Reduced escalator service until early June 2010.
This will affect journeys
from 15/01/2010 13:20
to 15/06/2010 02:29
.
Message Received : 15/01/2010 13:27
WATERLOO STATION: Reduced escalator service until late June 2010.
This will affect journeys
from 09/10/2009 09:43
to 30/06/2010 02:29
.
Message Received : 09/10/2009 09:43